Pakistan First Subway Train Rolled Out

+




The Orange Line Metro project is going to start and the first train of this orange line has rolled off the assembly lines in China. The train was produced in a factory, which is located in Hunan Province of China and the 5 coaches will also be attached to it. This is the first train of the 27 trains for Orange Line Metro and the design of the train is inspirited by the flower, jasmine and the shape of the dome of Badshahi Mosque Lahore. The company, CRRC Zhuzhou Locomotive Co Limited has designed and produced this train.

The orange line train will be used for 25.58 kilometer long Orange line metro project and the engineers at CRRC Zhuzhou said that the orange line train will be added with energy saving air conditioning system and the air conditioning system is designed with the constant high temperature during summer and the factors of unstable voltage in Pakistan.

There is another feature of the design of the orange line train is heat resistant bogies to aim to increase the durability of the train. The train will have the speed of 80 km/h. this particular train will be delivered to Pakistan in July this year. The remaining 26 trains will be delivered at the end of the year.

Pakistan First Subway Train Rolled Out

Pakistan First Subway Train Rolled Out

 

VN:F [1.9.22_1171]
Rating: 0.0/10 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)


Advertisement

Comments are closed.